POTABLE WATER PROJECTS: East-West Transmission Pipelines: Over $6M. Marzan, SSN # 547-77-3707 California Professional Civil Engineer, C52564 A partial list of projects and professional experienceGreater Atlanta Area President at 4aGoodCause Internet Education Auburn University 1993 1995 MBA, Information Technology Auburn University 1988 1993 Bachelor of Science, Materials Engineering Experience 4aGoodCause April 1998 - Present MCI October 1997 - April 1998 CyberNet Solutions March 1996 - October 1997 Skills Web Development. CZI Medicon, Healthcare Informatics Center. Czech Technical University.Project required a lot of environmental and public mitigations, public meetings, presentations, clean-ups, dust mitigation, and limited work hours. 3, construction of 14” steel mains in heavily populated West Hills, Los Angeles County, through residential neighborhoods not within LVMWD. 2, construction of 1 mile 12” PVC recycled water line on Mureau Road and Ph.
Haestad Cybernet Professional ExperienceGreater AtlantaEncompassed 15 steel tanks, 1 concrete reservoir, and 2 open recycled water earthen reservoirs. I was responsible for ensuring chain of custody disposal of removed original waste materials from tank. A multi-year systematic repair of mostly steel tanks, including safety compliance improvements, seismic improvements, and in some cases removal of old high VOC coal tar and supertank solution coats and replacement with SCAQMDcompliant coatings. Tank Repairs Program: Over $3M. After the water is treated and filtered, this is used to serve the District’s western water distribution system. Westlake Pump Station (16.1 MGD potable) Electrical and Mechanical Upgrades: This pump station delivers water from MWD to LVMWD’s Westlake Reservoir. LV-2 Pump Station Site Civil, Mechanical, and Electrical Improvements: LV-2 is one of three conduits that receive water from Metropolitan Water District (MWD), over 10 MGD flow. Several face-to-face negotiations with CCC staff in Ventura, including attendance of region-wide hearings, before a permit was finally issued. County Department of Public Works and City of Calabasas Potable Water Main Flow Flushings and Fire Flow Testing: To ensure water quality, mains at dead-ends are flushed, and valves are exercised, and to certify fire flows for local agencies. Underground US 101 Freeway crossing: construction of 18” PW pipe underneath US 101 in Calabasas needed permits from CalTrans, and approvals from L.A. I performed structural analysis and refurbishment design to augment structure. Remediation of pipe bridge structural steel crossings across creeks within LVMWD service areas. Lscolors macEngineering Report for the Use of Recycled Water inside the LVMWD Head Quarters building, Calabasas, CA. Submitted and approved by California Department of Health Services. This updated report discussed the use of recycled water indoors, in car washes, and other industrial applications. Design and Installation of Aqua-Ammonia bulk dispensing system: I designed and executed this project to produce chloramines for Westlake Pump Station, to accommodate MWD change from chlorine to chloramine disinfection.ENGINEERING STUDIES AND REPORTS AUTHORED BY MEL MARZAN: Engineering Report for the Use of Recycled Water within the Las Virgenes Municipal Water District Service Area, an overhaul of a previous report 12+ years old. To increase contact time (CT) for disinfection as required by the State’s Department of Health Services, baffles were installed in the disinfection tank. Trademarks The following are registered trademarks of Haestad Methods, Inc.: CulvertMaster, Cybernet, Darwin, FlowMaster.Installation of Baffles at Westlake Pump Station: This facility uses diatomaceous earth filtration and for water finishing. 1 & 2, includes disposal and chain-of-custody documentation for discarded diesel tanks. Consultant: Boyle Engineering Corp., Ventura, CA.WASTEWATER FACILITIES ENGINEERING PROJECTS Lift Stations 1 & 2 Site Improvements: Removal of deteriorated steel diesel fuel tanks and replacement with above ground tanks, with design and installation of Overflow control facilities at District Lift Station Nos. Managed Hydrologic Evaluation of Westlake Reservoir, considered ways to minimize water losses copper sulfate seeding to control eutrophication, limnologic assessments. Horse download gameAdministered Westlake Wells Groundwater Mitigation Program. Consultant: Dudek Engineering, Encinitas, CA. Preparation of Plans and Specifications of Recycled Water Pipeline from District’s Tapia Water Reclamation Plant to Mulholland Hwy., (as above) about 2 miles steel pipe. Consultant: Boyle Engineering Corp., Ventura, CA. This project was the refurbishment of that station, with newer flow measurement apparatus.RECYCLED WATER ENGINEERING PROJECTS Preliminary Study, Environmental Documentation, and Design Memorandum to determine optimum alignment of Recycled Water Pipeline from District’s Tapia Water Reclamation Plant to Mulholland Hwy. Upgrade of LVMWD’s Sewer Connection with City of L.A.: Excess sewage in LVMWD’s eastern area is pumped by Lift Station # 1 over to City of L.A. MS Office products Have used engineering programs as AutoCAD, Haestad, CyberNET, ESRI ArcCad, etc. Manages implementation of mitigation measures, prepares periodic reportsPrepares criteria for request for bids and/or proposals, for consultants, contractors, or vendors Leads selection committee to arrive at a consensus for consultant/contractor/vendor choice and Board recommendation Detailed financial accounting and management, cash flow, analysis of invoices and pay estimates, present values, future values, change orders negotiations, payments, retentions, close-out and final Board acceptance and release of escrow accounts Computer literate and flexible with applications, i.e.
0 Comments
Leave a Reply. |
AuthorBim ArchivesCategories |